Search Issue Tracker
Fixed in 5.1.0
Votes
0
Found in
5.1.0b5
Issue ID
693343
Regression
Yes
Blend Tree: Extra Blend param is created and assigned
1. What happened
Creating a sub-blend tree, creates 2 Blend param sliders on the first blend tree.
2. How we can reproduce it using the example you attached
Create a new Animator Controller
In the Animator, right click and create a New Blend Tree
Double-click on the blend tree to go inside
In the Inspector, click + and create another New Blend Tree
BUG: the first blend tree has 2 Blend params assigned to it :(
note: Many bad things happen after creating this state when playing with the parameters.
All about bugs
View bugs we have successfully reproduced, and vote for the bugs you want to see fixed most urgently.
Latest issues
- Text overlap and is unreadable in Inspector > Terrain Paint Texture after creating new Terrain Layer
- Event "XRInputSubsystem.trackingOriginUpdated" triggers twice when recentering the view
- UITK TextField value is overwritten incorrectly by the converter result when Binding Mode is set to "To Source"
- Out of memory crash when selecting more than 80000 Assets simultaneously
- Test Runner fails to create a script in the active path when selecting a file as the active path
Add comment