Search Issue Tracker

By Design

Votes

0

Found in

4.3.0b6

Issue ID

570523

Regression

No

Strange sorting order in project view

Project Browser/Hierarchy

-

Strange asset sorting order in project view.
To reproduce:
1. Import the attached package into a project
2. Inspect the imported folder ( Art/GUI/help )
Expected result:
Story 00a
Story 00b
Story 0a1
Actual result:
Story 00a
Story 0a1
Story 00b.

This is actually by design as we use human-like sorting: Sorts strings alphabetically, but with numbers in strings numerically, so "xx11" comes after "xx2".

Add comment

Log in to post comment

All about bugs

View bugs we have successfully reproduced, and vote for the bugs you want to see fixed most urgently.