Search Issue Tracker
Won't Fix
Won't Fix in 2023.3.X
Votes
2
Found in
2022.3.7f1
2023.1.8f1
2023.2.0b4
2023.3.0a3
Issue ID
UUM-45383
Regression
Yes
Children of a Prefab change order in the Hierarchy after changing the Editor version
How to reproduce:
1. Open the “IN-49246_repro.zip“
2. Open the “BasePrefabVeriant“ asset and observe its child objects in the Hierarchy
3. Upgrade the Editor version
4. Open the “BasePrefabVeriant“ asset and observe its child objects in the Hierarchy
Expected result: The order of the child objects is the same
Actual result: The order of the child objects is different
Reproducible with: 2022.1.0a15, 2022.3.7f1, 2023.1.8f1, 2023.2.0b4
Not reproducible with: 2021.3.29f1, 2022.1.0a14
Reproducible on: Windows 10
Add comment
All about bugs
View bugs we have successfully reproduced, and vote for the bugs you want to see fixed most urgently.
Latest issues
- VFX Graph Documentation dropdown button does nothing when clicked on the right side
- Required SpriteMask class (ID 331) is stripped when "Strip Engine Code" is enabled
- “Maximized serialized file backup not found” error is thrown when minimizing a window in a newly opened project
- Build stack trace contains invalid lines when building with IL2CPP using scripts with delegates containing generic types in the signature
- Entities Systems window has a “Show Full Player Loop” dropdown which does nothing when clicked after enabling “Show Full Player Loop”
Resolution Note:
Restructuring Prefabs not supported in 2022.1.0a14 or before.
Resolution Note (2023.3.X):
Restructuring Prefabs not supported in 2022.1.0a14 or before.