Search Issue Tracker
Not Reproducible
Votes
0
Found in
Issue ID
972876
Regression
No
Adding a prefab to a scene + undo/redo will change order of hierarchy
Steps:
1. Make a prefab out of any GameObject
2. Add a few GameObject with the names like "n1, n2, n3" to easy recognize the order
3. Deactivate one of the GameObject at the top of the Hierarchy
4. Instantiate a prefab somewhere in the middle
5. Delete it and do redo + undo
==>
The position of a prefab instance goes down
Take a look into attached gif
All about bugs
View bugs we have successfully reproduced, and vote for the bugs you want to see fixed most urgently.
Latest issues
- Required SpriteMask class (ID 331) is stripped when "Strip Engine Code" is enabled
- “Maximized serialized file backup not found” error is thrown when minimizing a window in a newly opened project
- Build stack trace contains invalid lines when building with IL2CPP using scripts with delegates containing generic types in the signature
- Entities Systems window has a “Show Full Player Loop” dropdown which does nothing when clicked after enabling “Show Full Player Loop”
- Entities Hierarchy Search “Show/Hide” button’s Lens Icon is blurry when the Editor is on an external monitor
Add comment